-
Our pricing includes:
Building materials
Free delivery
Professional installation
Taxes are included in your final quoted total unless otherwise stated.
No hidden add-ons. No surprise charges after the fact.
-
Snow load requirements depend on your ZIP code.
We regularly quote buildings rated for:
40 PSF
50 PSF
60 PSF
70 PSF
Because we’re built for Midwest winters, we make sure your structure meets local requirements. Send us your ZIP code and we’ll calculate it for you.
-
Typical lead times are 2–6 weeks after:
The deposit is received
Paperwork is finalized
Weather and peak season may slightly affect scheduling.
-
Deposit amounts vary based on building size and configuration.
Your deposit:
Locks in your pricing
Secures your production slot
-
In most areas, yes.
Customers are responsible for securing permits unless otherwise discussed. Always check with your township or county before ordering.
For larger commercial buildings, engineered blueprints may be required and typically range from $500–$3,000 depending on local engineering requirements.
We provide blueprints and the builder’s license to support the process.
-
No — we do not provide concrete or site preparation services.
Customers coordinate concrete and site prep with a local contractor. Our quotes cover the building itself and include free delivery and professional installation.
-
Yes. We offer rFOIL Reflective Bubble Insulation (2500 Series), designed specifically for metal and post-frame buildings.
Performance includes:
R-6 for walls
R-10 for ceilings
Blocks up to 96% of radiant heat transfer
Helps prevent interior condensation
Provides a continuous thermal break
-
Yes — this is one of its biggest benefits.
The insulation helps:
Reduce interior surface condensation
Create a vapor barrier
Prevent moisture buildup
It does not absorb water, promote mold growth, or support bacteria — which is especially important during Midwest temperature swings.
-
Yes.
The insulation:
Is Class A / Class 1 fire-rated
Is puncture and tear resistant
Does not absorb water vapor
Does not promote mold or mildew
Is UV resistant
Will not crack, bleed, or delaminate
It’s engineered specifically for steel structures.
-
At this time, we do not install gutters.
Customers typically hire a local contractor to add gutters after installation if needed.
-
For most full-size trucks (like an F-150), we recommend:
Minimum 10’ wide door
8’ tall door (9’ if lifted)
Send us your vehicle specs and we’ll confirm a comfortable fit.
-
Yes.
You can customize:
Roll-up vs. overhead doors
Window placement
Door swing direction
Color options
All changes must be finalized before paperwork submission.
-
Yes — both are available.
Vertical siding:
More modern appearance
Better water runoff
Horizontal siding:
Traditional look
We’re happy to share photos if you’re deciding between the two.
-
Yes.
We can add:
Side lean-tos
Covered patio overhangs
Frame-outs
Provide the dimensions and placement, and we’ll adjust your quote.
-
Financing availability depends on project size and current programs.
Contact us directly and we’ll walk you through current options.
-
We primarily serve:
Michigan
Wisconsin
If you’re outside these states, send us your location and we’ll confirm availability.